{"id":32271,"date":"2024-09-10T10:00:16","date_gmt":"2024-09-10T03:00:16","guid":{"rendered":"https:\/\/lacviet.vn\/?p=32271"},"modified":"2025-03-17T16:19:51","modified_gmt":"2025-03-17T09:19:51","slug":"quy-trinh-lam-viec","status":"publish","type":"post","link":"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/","title":{"rendered":"Build workflow with 30 diagram template process of the company"},"content":{"rendered":"<p style=\"text-align: justify;\">Become a business professional \u2013 modern \u2013 performance, then build <strong>workflow<\/strong> operation is indispensable, especially in the context of culture as currently. To proceed to the business of, the first step is standardizing the process to perform the work to digitize up to the system administrator.<\/p>\n<p style=\"text-align: justify;\">So building process work how standardized and streamlined, but still bring operational efficiency, optimal? The same <a href=\"https:\/\/lacviet.vn\/en\/\">Lac Viet<\/a> find out now in this article.<\/p>\n<p><a href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/?utm_source=blog-quy-trinh&amp;utm_medium=banner-top\" target=\"_blank\" rel=\"nofollow noopener\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-45659\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2025\/03\/iso-dien-tu-banner.gif\" alt=\"Gi\u1ea3i ph\u00e1p qu\u1ea3n l\u00fd quy tr\u00ecnh ISO \u0111i\u1ec7n t\u1eed\" width=\"970\" height=\"250\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2025\/03\/iso-dien-tu-banner.gif 970w, https:\/\/lacviet.vn\/wp-content\/uploads\/2025\/03\/iso-dien-tu-banner-768x198.gif 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2025\/03\/iso-dien-tu-banner-18x5.gif 18w\" sizes=\"(max-width: 970px) 100vw, 970px\" \/><\/a><\/p>\n<h2 style=\"text-align: justify;\">1. What is a Workflow?<\/h2>\n<blockquote>\n<p style=\"text-align: justify;\"><strong><i>Workflow<\/i><\/strong><i> l\u00e0 chu\u1ed7i c\u00e1c b\u01b0\u1edbc th\u1ef1c hi\u1ec7n x\u1eed l\u00fd c\u00f4ng vi\u1ec7c nh\u1eb1m gi\u1ea3i quy\u1ebft m\u1ed9t v\u1ea5n \u0111\u1ec1 nghi\u1ec7p v\u1ee5 ho\u1eb7c \u0111\u1ea1t \u0111\u01b0\u1ee3c m\u1ee5c ti\u00eau c\u1ee5 th\u1ec3 \u0111\u1ec3 ho\u1ea1t \u0111\u1ed9ng kinh doanh \u0111\u01b0\u1ee3c v\u1eadn h\u00e0nh xuy\u00ean su\u1ed1t.<\/i><\/p>\n<\/blockquote>\n<p><img decoding=\"async\" class=\"aligncenter wp-image-32283 size-full\" style=\"text-align: center;\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-1.png\" alt=\"Quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-1.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-1-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-1-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p style=\"text-align: justify;\">In a business there will be 4 types of Workflow\nbasic below:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Operating procedures business<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Process manager clients<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Process innovation<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Process social regulatory agency state management<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Depending on the operation characteristics of each business will have the process to perform the specific job details to ensure businesses operate best.<\/p>\n<h2 style=\"text-align: justify;\">2. X\u00e2y d\u1ef1ng quy tr\u00ecnh l\u00e0m vi\u1ec7c, x\u1eed l\u00fd c\u00f4ng vi\u1ec7c \u0111em l\u1ea1i l\u1ee3i \u00edch g\u00ec?<\/h2>\n<p style=\"text-align: justify;\">Done building model diagram workflow and standardized up the tools of bringing many benefits for businesses, such as:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><strong><em>The excess work not need to be removed thoroughly<\/em><\/strong>: business not set <a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-van-hanh-doanh-nghiep\/\">operating procedures<\/a> usually arises many jobs redundant, time-consuming, but don&#039;t bring work efficiency. Done building workflows that will help the business look get back to standardize the whole process, identify where is the work important influence to bring the final result. Thanks to it, get rid of the excess reducing performance.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><strong><em>Increase coordination between departments department in company<\/em><\/strong>: Many cases of conflict in business comes from the inconsistency of employees between departments. The disagreement comes from the no <a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-phoi-hop-giua-cac-phong-ban\/\">process coordination between departments<\/a> basically, leads to disagreement in the process of handling the job. A clear process in detail, specifying job responsibilities of each employee, the department will increase effective cooperation between the departments together.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><strong><em>Risk management efficiency<\/em><\/strong>: Business process perform the work clearly with the division of responsibilities detailed help easily determine the cause when problems arise. The timely detection, give solutions quickly will help enterprise risk management effectiveness.<\/li>\n<\/ul>\n<h2>2. 30 M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c c\u00f4ng ty d\u1ea1ng s\u01a1 \u0111\u1ed3 v\u00e0 file m\u00f4 t\u1ea3 quy tr\u00ecnh x\u1eed l\u00fd c\u00f4ng vi\u1ec7c chi ti\u1ebft<\/h2>\n<h3>2.1 Schematic workflow room business<\/h3>\n<ul>\n<li><strong>Sales process<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34499\" aria-describedby=\"caption-attachment-34499\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-34499 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-5.png\" alt=\"M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-5.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-5-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-5-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34499\" class=\"wp-caption-text\">Sales process<\/figcaption><\/figure>\n<ul>\n<li><strong>Process process for approval, business contracts<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34498\" aria-describedby=\"caption-attachment-34498\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-34498 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-4.png\" alt=\"M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-4.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-4-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-4-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34498\" class=\"wp-caption-text\">The process for approval, business contracts<\/figcaption><\/figure>\n<h3>2.2 M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c c\u1ee7a b\u1ed9 ph\u1eadn Marketing<\/h3>\n<ul>\n<li><strong>Implementation process job website SEO<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34500\" aria-describedby=\"caption-attachment-34500\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-34500 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-6.png\" alt=\"M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-6.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-6-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-6-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34500\" class=\"wp-caption-text\">Process SEO website<\/figcaption><\/figure>\n<ul>\n<li><strong>Model building process \u2013 running advertising campaign<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34501\" aria-describedby=\"caption-attachment-34501\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-34501 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-7.png\" alt=\"S\u01a1 \u0111\u1ed3 quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-7.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-7-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-7-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34501\" class=\"wp-caption-text\">Pattern diagram of the construction process \u2013 running advertising campaign<\/figcaption><\/figure>\n<ul>\n<li><strong>Process of implementation of construction work made to order.<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34502\" aria-describedby=\"caption-attachment-34502\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-34502 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-8.png\" alt=\"M\u1eabu quy tr\u00ecnh th\u1ef1c hi\u1ec7n c\u00f4ng vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-8.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-8-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-8-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34502\" class=\"wp-caption-text\">Process of implementation of construction work content content<\/figcaption><\/figure>\n<h3>2.4 M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c ph\u00f2ng nh\u00e2n s\u1ef1<\/h3>\n<ul>\n<li><strong>Recruitment process<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34503\" aria-describedby=\"caption-attachment-34503\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-34503\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-9.png\" alt=\"M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-9.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-9-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-9-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34503\" class=\"wp-caption-text\">Recruitment process hr<\/figcaption><\/figure>\n<ul>\n<li><strong>Process internal training<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34504\" aria-describedby=\"caption-attachment-34504\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-34504\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-10.png\" alt=\"M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-10.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-10-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-10-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34504\" class=\"wp-caption-text\">Process internal training<\/figcaption><\/figure>\n<h3>2.5 S\u01a1 \u0111\u1ed3 quy tr\u00ecnh l\u00e0m vi\u1ec7c ph\u00f2ng h\u00e0nh ch\u00ednh<\/h3>\n<ul>\n<li><strong>Incoming Document Processing Procedure<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34505\" aria-describedby=\"caption-attachment-34505\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-34505 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-11.png\" alt=\"M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-11.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-11-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-11-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34505\" class=\"wp-caption-text\">Incoming Document Processing Procedure<\/figcaption><\/figure>\n<ul>\n<li><strong>Process pending stationery<\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_34506\" aria-describedby=\"caption-attachment-34506\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-34506\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-12.png\" alt=\"M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-12.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-12-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-12-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-34506\" class=\"wp-caption-text\">Process pending stationery<\/figcaption><\/figure>\n<blockquote>\n<p style=\"text-align: center;\">&gt;&gt;&gt; Watch now <a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-thao-tac-chuan-sop\/\" target=\"_blank\" rel=\"noopener\">m\u1eabu quy tr\u00ecnh chu\u1ea9n (SOP)<\/a> trong l\u0129nh v\u1ef1c nh\u00e0 thu\u1ed1c, s\u1ea3n xu\u1ea5t, logictics<\/p>\n<\/blockquote>\n<h3>2.6 Download for free the 30 diagram template workflow and file description perform detail work<\/h3>\n<ul>\n<li>30 Sample process departments schematic work-flow<\/li>\n<li>Excel File described in detail process, perform the work, parts \u2013 officer in charge with the sample business respectively.<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-33208 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/bo-quy-trinh-lam-viec.png\" alt=\"b\u1ed9 quy tr\u00ecnh l\u00e0m vi\u1ec7c c\u00e1c ph\u00f2ng ban trong doanh nghi\u1ec7p\" width=\"1200\" height=\"630\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/bo-quy-trinh-lam-viec.png 1200w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/bo-quy-trinh-lam-viec-768x403.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/bo-quy-trinh-lam-viec-18x9.png 18w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<table class=\"table-usp\">\n<tbody>\n<tr>\n<td style=\"width: 100%; text-align: center;\"><strong>DOWNLOAD FREE 30+ SAMPLE process management business <a href=\"https:\/\/drive.google.com\/drive\/folders\/1wRMYYXCWCNTvHxmSWXn-fInn-7ElqT1o?usp=drive_link\" target=\"_blank\" rel=\"nofollow noopener\">AT THIS<\/a><\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>3. X\u00e2y d\u1ef1ng quy tr\u00ecnh l\u00e0m vi\u1ec7c c\u1ee7a c\u00f4ng ty v\u1edbi 6 B\u01af\u1edaC TINH G\u1eccN chuy\u00ean nghi\u1ec7p<\/h2>\n<p style=\"text-align: justify;\">There are up to 85% of problems arising in business comes from the work elements are not made according to a <a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-quan-ly-doanh-nghiep\/\">the process management business<\/a> standard consistency.<\/p>\n<blockquote><p>To solve the administrator of this, let&#039;s Lac system setup workflow of the company with 6 steps streamlined below:<\/p>\n<ul>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#buoc-1-xac-dinh-nhu-cau-muc-tieu-pham-vi-quy-trinh\"><i>Step 1: Identify needs, goals, scope process<\/i><\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#buoc-2-xay-dung-cac-buoc-quy-trinh-can-trien-khai\"><i>Step 2: construction of the process steps need to deploy<\/i><\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#buoc-3-xac-dinh-diem-kiem-soat-hieu-qua-van-hanh\"><i>Step 3: Determine control points operating efficiency<\/i><\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#buoc-4-phan-cong-nhiem-vu-trach-nhiem-cong-viec\"><i>Step 4: assigning duties and job responsibilities<\/i><\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#buoc-5-xac-dinh-phuong-phap-kiem-tra-quy-trinh\"><i>Step 5: Determine the test method procedure<\/i><\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#buoc-6-xay-dung-huong-dan-mo-ta-trien-khai-quy-trinh\"><i>Step 6: build guide describes deployment process<\/i><\/a><\/li>\n<\/ul>\n<\/blockquote>\n<figure id=\"attachment_32284\" aria-describedby=\"caption-attachment-32284\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-32284 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-2.png\" alt=\"X\u00e2y d\u1ef1ng quy tr\u00ecnh l\u00e0m vi\u1ec7c c\u1ee7a c\u00f4ng ty\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-2.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-2-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-2-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-32284\" class=\"wp-caption-text\">Construction work processes of the company with 6 steps STREAMLINED<\/figcaption><\/figure>\n<h3 style=\"text-align: justify;\">Step 1: Identify needs, goals, scope process<\/h3>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Identify needs: collect information from the relevant departments to understand the actual needs should be addressed through the process. And setting up this process is to meet the needs what, for example, to upgrade to system process number, perform standardized process to apply software tools.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Define goals: Lay out the specific goals that the process should be achieved, including short-term goals and long-term during the construction process, what is?<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Define the scope: Define the scope of application of the process, including the departments and the specific job will be deployed in this process.<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">Step 2: construction of the process steps need to deploy<\/h3>\n<p style=\"text-align: justify;\">Two activities to do in this step:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Make a list of the steps required: Listed in detail each specific steps in the process, from beginning to end.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Detailed description step by step: clear definition, step by step, including the action to be taken, time, material, and tool support.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">To set the steps in the process, bring efficiency to apply suitable models such as:<\/p>\n<p style=\"text-align: justify;\"><i>a\/ Model 5W-1H-5M:<\/i><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">What \u2013 what Is: Determine the content of work in the process.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Why \u2013 why: Determine goals and requirements of the job.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">When \u2013 When: Determine the 3 timelines start. done and finished.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Where \u2013 where: Identify a location to do the job.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Who \u2013 Who: Identify the direct work, the support and supervision.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">How \u2013 how: Identify the methods of application in the work.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><i>b\/ Model 5M to identify important resources in the process:<\/i><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Man \u2013 Human resources: capacity Assessment qualifications, skills of the employees meet work is assigned or not?<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Money \u2013 Budget: planning estimated budget for each item in the process.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Material \u2013 Raw material: Confirm the raw material supply, transport operations or tools to apply.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Machine \u2013 technology, machinery: Determine the readiness of the technology and machinery that are related to the deployment process.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Method \u2013 Method of execution: building the methods work effectively to ensure the process when go into operation smoothly.<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">Step 3: Determine control points operating efficiency<\/h3>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Specify the control points: Lay out the critical control points to monitor, identify the process when operating properly planned and effectively.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Set test indicator high efficiency: Lay out the index performance measurement indicators (KPIs) to evaluate and monitor progress made.<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">Step 4: assigning duties and job responsibilities<\/h3>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Specify the individual roles and responsibilities of the staff involved in the process.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Assign specific tasks for each staff member or department to ensure people understand his work.<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">Step 5: Determine the test method procedure<\/h3>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Choose the method of examination and assessment processes, such as internal inspection, periodic inspection, or 360 degree assessment from the outside. Then plan specific for the test, including duration, frequency, and the evaluation criteria.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">If the business is no method that can set the check with factors such as: the steps in The process need to check \u2013 important Points to check out \u2013 The make \u2013 Frequency implementation.<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">Step 6: build guide describes deployment process<\/h3>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Drafting documentation: Written document that describes in detail the process, including the implementation steps, tasks, responsibilities, as well as the control points.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Downloads documentation for the entire staff related. Organize training sessions to ensure people understand to execute the right process.<\/li>\n<\/ul>\n<table class=\"table-usp\">\n<tbody>\n<tr>\n<td style=\"width: 100%;\">\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-33208 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/bo-quy-trinh-lam-viec.png\" alt=\"M\u1eabu quy tr\u00ecnh l\u00e0m vi\u1ec7c\" width=\"1200\" height=\"630\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/bo-quy-trinh-lam-viec.png 1200w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/bo-quy-trinh-lam-viec-768x403.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/bo-quy-trinh-lam-viec-18x9.png 18w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/drive.google.com\/drive\/folders\/1wRMYYXCWCNTvHxmSWXn-fInn-7ElqT1o?usp=drive_link\" target=\"_blank\" rel=\"nofollow noopener\"><i><span style=\"text-decoration: underline;\"><strong>Download FREE sample workflow of a professional company<\/strong><\/span><\/i><\/a><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"text-align: justify;\">4. C\u00e1c m\u00f4 h\u00ecnh x\u00e2y d\u1ef1ng quy tr\u00ecnh l\u00e0m vi\u1ec7c c\u1ee7a c\u00f4ng ty hi\u1ec7u qu\u1ea3<\/h2>\n<blockquote><p>5 popular Model is now applied to build the workflow:<\/p>\n<ol>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#4-1-mo-hinh-pdca-plan-do-check-act\">Model PDCA (Plan-Do-Check-Act)<\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#4-2-dmaic-trong-six-sigma\">DMAIC in Six Sigma<\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#4-3-mo-hinh-toyota-production-system-tps\">Model Toyota Production System (TPS)<\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#4-4-mo-hinh-total-quality-management-tqm\">Model Total Quality Management (TQM)<\/a><\/li>\n<li><a href=\"https:\/\/lacviet.vn\/en\/quy-trinh-lam-viec\/#4-5-mo-hinh-agile\">Model Agile<\/a><\/li>\n<\/ol>\n<\/blockquote>\n<h3 style=\"text-align: justify;\">4.1 Model PDCA (Plan-Do-Check-Act)<\/h3>\n<p style=\"text-align: justify;\">Model PDCA (Plan-Do-Check-Act) is a management tool for continuous improvement, consists of 4 main steps:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Plan (plan): Define detailed plan to achieve the goal and the necessary resources, planning specific actions.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Do (perform): implementing proposed plan. Record the results, problems arise in the implementation process.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Check (Check): Evaluation of the results made by comparison with the original goal. Analysis of the deviations, causes.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Act (Action): perform the action adjusted based on the evaluation results. Implementation of the improved method to process work more efficiently.<\/li>\n<\/ul>\n<figure id=\"attachment_32285\" aria-describedby=\"caption-attachment-32285\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-32285 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-3.png\" alt=\"x\u00e2y d\u1ef1ng quy tr\u00ecnh l\u00e0m vi\u1ec7c c\u1ee7a c\u00f4ng ty\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-3.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-3-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/quy-trinh-lam-viec-3-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-32285\" class=\"wp-caption-text\">Model PDCA<\/figcaption><\/figure>\n<h3 style=\"text-align: justify;\">4.2 DMAIC in Six Sigma<\/h3>\n<p style=\"text-align: justify;\">DMAIC is a method of Six Sigma is used to <a href=\"https:\/\/lacviet.vn\/en\/cai-tien-quy-trinh-lam-viec\/\">improved workflow<\/a>include 5 steps:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Define (Determine): Identify the problem to be solved, goals for improvement and the scope of the project.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Measure (Measure): collect data to assess the current situation of the process. Measure the performance metrics important.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Analyze (analysis): data analysis to determine root causes of problems. Use the tools of statistical analysis to find out the influencing factors.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Improve (Improvement): proposed deployment of innovative solutions to fix the problem. Test and evaluate the effectiveness of the solution.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Control (control): set the control measures to maintain process improvements. Ensure that the improvements are maintained continuously improved.<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">4.3 Model Toyota Production System (TPS)<\/h3>\n<p style=\"text-align: justify;\">TPS is a production system developed by Toyota, that comprises the principles and methods below:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Just-In-Time (JIT): Produced only when there is demand, reducing waste and inventory.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Jidoka: automation with a human element, to stop production when the error detection to avoid defective products continue in the process.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Kaizen: continuous Improvement, people in the company are involved in the search to make improvements small but constant.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Heijunka: planned production regularly, avoid work overload or lack of work.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Standardized Work: process work standardized to ensure consistency and efficiency.<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">4.4 Model Total Quality Management (TQM)<\/h3>\n<p style=\"text-align: justify;\">TQM is a management approach, comprehensive improvements in the quality of every aspect of business, including:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Customer Focus (customer focused): Put customers at the center of all activities and decisions.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Total Employee Involvement (involvement of the entire staff): Creating conditions for all employees involved in the process of quality improvement.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Process Approach (approach according to the process): Management activities, resources such as a process to reach desired result.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Integrated System (integrated System): Combine the process \u2013 activities into a unified system to achieve the strategic goals of the business.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Continuous Improvement (continuous Improvement): Always looking for improvement opportunities in all activities of the business.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Fact-Based Decision Making (decisions based on data): Use data and analysis to make decisions to manage and improvements.<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">4.5 Model Agile<\/h3>\n<p style=\"text-align: justify;\">Agile is a flexible method in project management, usually applied in software development, including:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Individuals and Interactions (human and interactive): Priority to the interaction between the individual, the work group rather than processes and tools.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Working Software (software active): Focus on providing software actual operation is more fully documented.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Customer Collaboration (cooperation with the customer): Continuous cooperation with customers throughout the development process to ensure products meet their needs.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Responding to Change (rapid Response to change): ready-flexibility to adapt to the changes instead of strict adherence to the original plan.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Iterative Development (development loop): implementation of development according to the short loop (sprints) to quickly provide value, get feedback from customers.<\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\">5. Apply LV-DX Dynamic Workflow to establish, standardize, and operate corporate processes<\/h2>\n<p style=\"text-align: justify;\">Many businesses today are experiencing difficulty in the problem of chemical process up digital platforms such as:<\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\">Yet have the full set of operating procedures to standardize professional<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">&#039;ve built processes, however, still carry freight in the traditional way, forwarding the signed approval crafts that cause loss of time, effort.<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Have known the need to perform digitized \u2013 standardized \u2013 apply tools, however, have not selected the right solution.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Aware of this problem, <a href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/\">LV-DX Dynamic Workflow<\/a> provide enterprise software platform to manage the set-up process, convert, normalize, storage, and operate every process on 1 single platform with the optimal cost.<\/p>\n\t\t<div data-elementor-type=\"loop-item\" data-elementor-id=\"33127\" class=\"elementor elementor-33127 e-loop-item e-loop-item-32271 post-32271 post type-post status-publish format-standard has-post-thumbnail hentry category-quy-trinh-so tag-quy-trinh\" data-elementor-post-type=\"elementor_library\" data-custom-edit-handle=\"1\">\n\t\t\t<div class=\"elementor-element elementor-element-18b928f e-con-full e-flex e-con e-parent\" data-id=\"18b928f\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5586bd7 elementor-widget elementor-widget-text-editor\" data-id=\"5586bd7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p style=\"text-align: center;\"><b>LV-DX Dynamic Workflow do to simplify the conversion process of?<\/b><\/p><h3>Provides system management \u2013 standardized process of comprehensive<\/h3><ul><li>Free build standardized processes for each business, based on the requirements given and the structure departments, by operation of business when BUYING a software package process of Vietnam.<\/li><li>The system allows the storage of the entire workflow on a single platform, data is synchronized, unified, easy synthesis and analysis.<\/li><li>Provide inventory process standard reference model for construction business.<\/li><\/ul><div><dl id=\"attachment_33051\"><dt><figure style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-thu-vien-quy-trinh.png\" alt=\"Giao di\u1ec7n qu\u1ea3n l\u00fd quy tr\u00ecnh LV-DX Dynamic Workflow\" width=\"800\" height=\"500\" \/><figcaption class=\"wp-caption-text\">Provides system management \u2013 standardized process of comprehensive<\/figcaption><\/figure><\/dt><\/dl><\/div><h3>Every activity, work performance managed, tracked live realtime (real time) on the process<\/h3><ul><li>LV-DX Dynamic Workflow integrated management software, job LV-DX Task to help work directly on the process.<\/li><li>Automatic transfer of tasks to employees, the next division at the end of the 1 stage in the process.<\/li><li>Track progress of implementation of the process, the work performance of each employee in real time.<\/li><li>Warning system work smart, auto send notification to employees involved when a process is established, the transfer task alerts, overdue done, ...<\/li><\/ul><div><dl id=\"attachment_33050\"><dt><figure style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-theo-doi-tien-do.png\" alt=\"Giao di\u1ec7n theo d\u00f5i ti\u1ebfn \u0111\u1ed9 LV-DX Dynamic Workflow\" width=\"800\" height=\"500\" \/><figcaption class=\"wp-caption-text\">Every activity, work performance managed, tracked live realtime (real time) on the process<\/figcaption><\/figure><\/dt><\/dl><\/div><h3>Application AI to help optimize performance operating procedures business<\/h3><ul><li>Integrated LV-DX eSign help job approval, signing a number of fast everything, everywhere on the process of. Leadership does not need to come to the company to make up for document browsing, now all operations can be performed remotely at all times with LV-DX Dynamic Workflow.<\/li><li>Integrated chatbot AI Lac Viet to help the leader out of control, the accurate data on the file browser to help the number quickly, avoid reporting anything complicated, optimal time is work, leaders have more time to build your business strategy, long-term performance improvements for the organization.<\/li><\/ul><div><dl id=\"attachment_33052\"><dt><figure style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-tich-hop-chatbo-ai.png\" alt=\"Giao di\u1ec7n qu\u1ea3n l\u00fd quy tr\u00ecnh LV-DX Dynamic Workflow\" width=\"800\" height=\"500\" \/><figcaption class=\"wp-caption-text\">Application AI to help optimize performance operating procedures business<\/figcaption><\/figure><p style=\"text-align: center;\"><a href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/?utm_source=blog&amp;utm_medium=banner-usp\" target=\"_blank\" rel=\"nofollow noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-32899 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-van-hanh.png\" alt=\"LV-DX Dynamic Workflow v\u1eadn h\u00e0nh\" width=\"1200\" height=\"630\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-van-hanh.png 1200w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-van-hanh-768x403.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-van-hanh-18x9.png 18w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/p><\/dt><\/dl><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-31dae5b elementor-widget elementor-widget-html\" data-id=\"31dae5b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"wrapper\">\n  <div class=\"box-gradient\"><strong><span style=\"color: #ffffff;\"><a style=\"color: #ffffff;\" href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/?utm_source=blog&amp;utm_medium=xem-tinh-nang\">SEE DETAILED FEATURES LV-DX DYNAMIC WORKFLOW<\/a><\/span><\/strong><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\n<blockquote>\n<p style=\"text-align: justify;\">Sign up <a href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/?utm_source=blog&amp;utm_medium=anchortext-demo&amp;utm_content=quy-trinh-lam-viec\" target=\"_blank\" rel=\"nofollow noopener\">FREE DEMO<\/a> software, LV-DX Dynamic Workflow to make the change number process business.<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">Hope these information about the building <strong>workflow<\/strong> the sample standard procedure due to Lac Viet provide good support for the business in the period of digitization and transformation processes of today. Any questions related to the solution of process action please <a href=\"https:\/\/zalo.me\/0901555063\" target=\"_blank\" rel=\"noopener\">contact us Vietnam<\/a> to get detailed consultation.<\/p>\n<div id=\"eJOY__extension_root\" class=\"eJOY__extension_root_class\" style=\"all: unset;\">\n<p><strong>CONTACT INFORMATION:<\/strong><\/p>\n<ul>\n<li aria-level=\"1\">Lac Viet Computing Corporation<\/li>\n<li aria-level=\"1\">Hotline:\u00a0<a class=\"text-is-phone-number\" href=\"tel:0901 555 063\" data-z-element-type=\"phone-number\">0901 555 063<\/a><span class=\"text\">\u00a0|\u00a0<\/span><a href=\"tel:(+84.28) 3842 3333\">(+84.28) 3842 3333<\/a><\/li>\n<li aria-level=\"1\">Email:\u00a0<a href=\"mailto:info@lacviet.com.vn\">info@lacviet.vn<\/a>\u00a0\u2013 Website:\u00a0<a href=\"https:\/\/lacviet.vn\/en\/\">https:\/\/lacviet.vn<\/a><\/li>\n<li aria-level=\"1\">Headquarters: 23 Nguyen Thi Huynh, P. 8, Q. Phu Nhuan, Ho Chi Minh city<\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tr\u1edf th\u00e0nh m\u1ed9t doanh nghi\u1ec7p chuy\u00ean nghi\u1ec7p &#8211; hi\u1ec7n \u0111\u1ea1i &#8211; hi\u1ec7u su\u1ea5t th\u00ec x\u00e2y d\u1ef1ng quy tr\u00ecnh l\u00e0m vi\u1ec7c l\u00e0 ho\u1ea1t \u0111\u1ed9ng kh\u00f4ng th\u1ec3 thi\u1ebfu, nh\u1ea5t l\u00e0 trong b\u1ed1i c\u1ea3nh s\u1ed1 h\u00f3a nh\u01b0 hi\u1ec7n nay. \u0110\u1ec3 ti\u1ebfn \u0111\u1ebfn doanh nghi\u1ec7p s\u1ed1, b\u01b0\u1edbc \u0111\u1ea7u ti\u00ean ch\u00ednh l\u00e0 chu\u1ea9n h\u00f3a quy tr\u00ecnh th\u1ef1c hi\u1ec7n c\u00f4ng vi\u1ec7c [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":32282,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[93],"class_list":["post-32271","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-quy-trinh-so","tag-quy-trinh"],"_links":{"self":[{"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/posts\/32271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/comments?post=32271"}],"version-history":[{"count":34,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/posts\/32271\/revisions"}],"predecessor-version":[{"id":45662,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/posts\/32271\/revisions\/45662"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/media\/32282"}],"wp:attachment":[{"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/media?parent=32271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/categories?post=32271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/tags?post=32271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}