{"id":36455,"date":"2026-03-20T14:44:51","date_gmt":"2026-03-20T07:44:51","guid":{"rendered":"https:\/\/lacviet.vn\/?p=36455"},"modified":"2026-03-20T16:49:42","modified_gmt":"2026-03-20T09:49:42","slug":"bang-theo-doi-tien-do-cong-viec","status":"publish","type":"post","link":"https:\/\/lacviet.vn\/en\/bang-theo-doi-tien-do-cong-viec\/","title":{"rendered":"Sample table track work progress Excel file control, good management"},"content":{"rendered":"<p><strong>Panel track the progress of the work<\/strong> is the administration tool helps to monitor tasks and projects through the core information such as job name, curator, deadline, status, completed. This tool provides a quick overview to managers timely identification, risk adjustment, planning and performance optimization work. Depending on the scale, enterprises can flexibly apply from the Excel template crafts to automation software to control the progress in a transparent way, with real cops<\/p>\n<p style=\"text-align: justify;\">However, neither organization would also understand how to use this file effectively or when should continue to use Excel, and when to switch to software management professional job. This article <a href=\"https:\/\/lacviet.vn\/en\/\">Lac Viet<\/a> will help businesses understand the true nature of the file tracking work progress, how to build and use effective, at the same time pointing out the practical limit to choose the right solution.<\/p>\n<h2 style=\"text-align: justify;\">1. The progress of the work is what? Why business need a file to keep track of?<\/h2>\n<p style=\"text-align: justify;\">In the context of business must handle increasingly many jobs at the same time, the \u201cknow exactly work are go\u201d became in demand management core. File tracking work progress born to solve the main problem is this: help managers grasp the progress made in the work, time control, and evaluate the results in a clear, transparent.<\/p>\n<h3 style=\"text-align: justify;\">1.1 Progress of the work is what?<\/h3>\n<blockquote>\n<p style=\"text-align: justify;\">Progress can be understood simply as the level of completion of the work according to the timelines committed. A job is not just \u201cdone\u201d, which should be completed the right time, the right volume, the right of the initial request.<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">In business management, the work progress is always fastened with three elements:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Duration: job starts when the finish when, correct deadline, no.<\/li>\n<li aria-level=\"1\">Volume done: finished, how many percent compared with the plan.<\/li>\n<li aria-level=\"1\">Outputs: work completed can meet its objectives or not.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">For example:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">With project marketing, progress not only is \u201calready running\u201d campaign, which also is each item as design, content, run ads, efficiency measurement are completed on schedule or not.<\/li>\n<li aria-level=\"1\">With production, progress shown at each stage: raw materials, machining, assembly, quality inspection.<\/li>\n<li aria-level=\"1\">With ERP implementation, progress is divided according to the stage as surveys, process design, system configuration, user training.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">When not well controlled schedule, business very easy to fall into the state late-term, the cost incurred to affect credibility with customers or partners.<\/p>\n<h3 style=\"text-align: justify;\">1.2 File tracking work progress, what is?<\/h3>\n<blockquote>\n<p style=\"text-align: justify;\">File tracking work progress is a management tool popular, often built in the form of Excel file or Google Sheets to record, update and track the implementation status of each job.<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">In fact, this file usually includes the basic information such as:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Job name<\/li>\n<li aria-level=\"1\">Person in charge<\/li>\n<li aria-level=\"1\">Time start \u2013 end<\/li>\n<li aria-level=\"1\">Deadline<\/li>\n<li aria-level=\"1\">Status or completion rate<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Based on file tracking work progress, managers can quickly know is:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Tasks are on schedule?<\/li>\n<li aria-level=\"1\">Any work risk late?<\/li>\n<li aria-level=\"1\">Who is in charge, need support now?<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Many businesses use Excel template track the progress of the work as a solution starting before investing the management system more complex.<\/p>\n<h3 style=\"text-align: justify;\">1.3 why the business is still priority, use the file tracking work progress?<\/h3>\n<p style=\"text-align: justify;\">Although there are now many software task management modern file tracking work progress is still very much business choice, especially small and medium enterprises. The cause comes from the actual value follows:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Firstly, to create easy to use. Most of the office are familiar with Excel, no need complex training or change work habits.<\/li>\n<li aria-level=\"1\">Monday, the cost is almost equal to 0. Enterprises do not need to invest in software or infrastructure technology, very suitable in the period budget was limited.<\/li>\n<li aria-level=\"1\">Tuesday, flexibly according to actual needs. File tracking progress can quickly edit, add or remove columns information according to each department or project specific.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/www.mckinsey.com\/capabilities\/operations\/our-insights\" target=\"_blank\" rel=\"noopener\">According to the report of McKinsey<\/a>businesses don't have the tools, progress tracking, clear usually takes from 20-30% of work time due to processing the exchange inefficiency, lack of timely information. This suggests that, although simple, but if built and used properly, the file tracking work progress still bring practical value in managing the operation.<\/p>\n<h2 style=\"text-align: justify;\">2. Standard structure of a file, track the progress of the work efficiency<\/h2>\n<p style=\"text-align: justify;\">In fact, a lot of businesses can use the file tracking work progress, but efficiency is not high. Common cause lies not in tool, which is located in the structural design file. A file that is too simple will not properly reflect the work situation, while the file is too complex make employees afraid to update.<\/p>\n<p style=\"text-align: justify;\">An excel file management, schedule management, work efficiency should achieve two goals:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Help people make easy updates, 't take much time<\/li>\n<li aria-level=\"1\">Helps managers look fast is known work is \u201cstable or have a problem\u201d<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">2.1 The information required to be on file<\/h3>\n<p style=\"text-align: justify;\">This is the column information platform, it is mandatory that in every panel track the progress of the work, regardless of business model or type of work.<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Job name: job Name should be clearly stated, in particular, avoid placing the generic name such as \u201cProcessing\u201d or \u201cSupport project\u201d. For example: \u201cFinishing reported second quarter revenues\u201d will help viewers understand right content, target work.<\/li>\n<li aria-level=\"1\">Person in charge: Each job needs associated with a person-in-charge. This helps to avoid \u201cmany people do, but no one is responsible\u201d, at the same time increase transparency and active in work.<\/li>\n<li aria-level=\"1\">Start time \u2013 end time: this info is to know about the estimated time to perform the work. This is the basis to evaluate the work are prolonged, unusual or not, especially with the work project.<\/li>\n<li aria-level=\"1\">Deadline: Deadline is the time commitment to complete. In the admin, this is the most important factor to control the progress. A file tracking work progress there is no deadline clearly will be very difficult to exert their effects.<\/li>\n<li aria-level=\"1\">Priority: Not any work is just as important as each other. The classification of priority level (high \u2013 medium \u2013 low) helps employees know should focus on the what before, at the same time manage the coordination resources when needed.<\/li>\n<li aria-level=\"1\">Task status: the State is often divided into levels such as has Not done \u2013 Is done \u2013 Finished \u2013 pause. Just look at this column, managers were able to grasp the overall picture of the entire work.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">The above information creates a \u201cskeleton frame\u201d of the file tracking work progress. If one of these factors, the monitoring and evaluation will be accurate.<\/p>\n<h3 style=\"text-align: justify;\">2.2 The column advanced helps to track progress, making more realistic<\/h3>\n<p style=\"text-align: justify;\">When businesses have more to work more, or need to control the progress more detail, the addition of the column advanced is very necessary. This is also the difference between a sample excel tracking the progress of work simple and a file is effectively used in practice.<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Completion rate (%): this Column helps to quantify progress instead of just look at the state of \u201cdoing\u201d. For example, two jobs are in the status \u201cdone\u201d, but a work has reached 80%, the remaining 20%, clearly the level of risk is very different.<\/li>\n<li aria-level=\"1\">Volume of work: volume can be measured by the number of heads, number of records, number of products, or any other unit suitable yet. When combined volume with % complete, management will more accurately assess the level of effort actual progress.<\/li>\n<li aria-level=\"1\">Date last updated: This is the often overlooked but very important. If a work is not updated in long time, it may be a sign of stagnation or lack of tracking.<\/li>\n<li aria-level=\"1\">Notes, causes slow progress: this Column helps to explain \u201cwhy slow work\u201d, instead of just noting the results. The causes such as lack of input data, depending other departments, or change request will be the basis to improve the process after this.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">According to the study of <a href=\"https:\/\/www.pmi.org\/learning\/thought-leadership\/pulse\" target=\"_blank\" rel=\"noopener\">Project Management Institute (PMI)<\/a>organizations have the ability to track, control the progress details will significantly reduce the risks delinquent avoid wasting resources.<\/p>\n<h2>3. The type of table tracking the progress of work are applied<\/h2>\n<h3>3.1 Panel track traditional (Manual Tracking)<\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Panel track tradition is usually done manually using tools such as Excel or Google Sheets. The tasks, deadlines, progress of the work to be entered and updated manually by the manager or team member.<\/span><\/p>\n<figure id=\"attachment_36488\" aria-describedby=\"caption-attachment-36488\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-36488 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/09\/bang-theo-doi-tien-do-cong-viec-1.png\" alt=\"b\u1ea3ng theo d\u00f5i ti\u1ebfn \u0111\u1ed9 c\u00f4ng vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/09\/bang-theo-doi-tien-do-cong-viec-1.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/09\/bang-theo-doi-tien-do-cong-viec-1-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/09\/bang-theo-doi-tien-do-cong-viec-1-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-36488\" class=\"wp-caption-text\">Track table traditional table excel<\/figcaption><\/figure>\n<p style=\"text-align: center;\"><strong><a href=\"https:\/\/drive.google.com\/drive\/folders\/12lAcqwLKzVPCHU6ri1xXY_h7S0isTOqM?usp=sharing\" target=\"_blank\" rel=\"nofollow noopener\">DOWNLOAD TEMPLATE BOARD TRACK WORK PROGRESS EXCEL FILE FROM LAC VIET<\/a><\/strong><\/p>\n<p style=\"text-align: justify;\"><b>Advantages:<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Simple flexibility:<\/b><span style=\"font-weight: 400;\"> Excel or Google Sheets provides more formatting options, easy to customize table followed suit the needs of each project.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Easy to use:<\/b><span style=\"font-weight: 400;\"> Many businesses are familiar with the use of the spreadsheet, so do not require special training for staff.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>No cost:<\/b><span style=\"font-weight: 400;\"> Use tools such as Google Sheets or Excel may not require the cost of buying new software.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Cons:<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Easy-to-happen errors:<\/b><span style=\"font-weight: 400;\"> Data entry craft easily lead to errors in the update process progress.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Hard real-time tracking:<\/b><span style=\"font-weight: 400;\"> Update may cause information become obsolete if not regularly maintained.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>The ability to automate low:<\/b><span style=\"font-weight: 400;\"> Lack of ability to automate or integrate with other management tools, other projects, causing difficulty in creating reports or track repeatedly.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>When to use:<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The small project requires high flexibility does not need to track progress details in real time.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Small and medium enterprises with limited budgets, the number of the task is not too big.<\/span><\/li>\n<\/ul>\n<h3>3.2 Panel track automatically (Automated Tracking)<\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Use the software manage modern work such as Trello,Jira, LV-DX Task, CoDX Task to track the progress of work in an automated way. These tools allow to set, update and report progress in real time without the need for manual intervention is too much.<\/span><\/p>\n<figure id=\"attachment_36489\" aria-describedby=\"caption-attachment-36489\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-36489 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/09\/bang-theo-doi-tien-do-cong-viec-2.png\" alt=\"b\u1ea3ng theo d\u00f5i ti\u1ebfn \u0111\u1ed9 c\u00f4ng vi\u1ec7c\" width=\"800\" height=\"500\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/09\/bang-theo-doi-tien-do-cong-viec-2.png 800w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/09\/bang-theo-doi-tien-do-cong-viec-2-768x480.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/09\/bang-theo-doi-tien-do-cong-viec-2-18x12.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-36489\" class=\"wp-caption-text\">Interface panel track progress automatically on software, LV-DX Task<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><b>Advantages:<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Automatic updates and notifications:<\/b><span style=\"font-weight: 400;\"> When there is a change in progress, this tool automatically send notifications to people involved, helps to maintain transparency, the link between the group members.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Features decentralized clear:<\/b><span style=\"font-weight: 400;\"> Allows management assign tasks easy with the role and powers are set specific.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Integrated with many other tools:<\/b><span style=\"font-weight: 400;\"> Platforms like Jira, LV-DX Task can be integrated with email and chat tools (Slack, Microsoft Teams), CRM system, help optimize workflow.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Report data analysis:<\/b><span style=\"font-weight: 400;\"> Provides the ability to create visual reports, analyze the progress of the work, discovered the knot to process improvement.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Cons:<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>High cost:<\/b><span style=\"font-weight: 400;\"> Some software requires a paid monthly or according to the number of users, making the cost higher if used in large scale.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Requires training:<\/b><span style=\"font-weight: 400;\"> A number of complicated tools may need time for the staff to get acquainted to use competently.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Depends on the technology:<\/b><span style=\"font-weight: 400;\"> If system trouble or troubled user about connection, can cause disruption for the process, progress tracking.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>When to use:<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Large projects with many members, complex tasks, reporting requirements, tracking details.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Businesses are adopting methods of modern management want to integrate technology into the process of project management.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\">4. When to use Excel file tracking work progress? When?<\/h2>\n<p style=\"text-align: justify;\">Can't deny that template excel track the progress of the work is popular tool accessible. However, businesses need to understand when to use and when not to depend entirely on Excel.<\/p>\n<h3 style=\"text-align: justify;\">4.1 case should use Excel template track the progress of the work<\/h3>\n<p style=\"text-align: justify;\">Excel fit in the case:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Small business, number of personnel, work has not many<\/li>\n<li aria-level=\"1\">Work, repeat the process stable, with little change<\/li>\n<li aria-level=\"1\">Need simple report mainly track completion status<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">At this stage, the file tracking work progress to help businesses:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Create habits management based on data<\/li>\n<li aria-level=\"1\">Standardized way to communicate and report<\/li>\n<li aria-level=\"1\">Tempo control without incurring the cost and investment system<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\">4.2 limitations of actual Excel template track the progress of the work<\/h3>\n<p style=\"text-align: justify;\">When the scale of work increased, the limitations of Excel starts, clearly revealed:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Data update depends on the consciousness of the user, easy to flaws or forget to update<\/li>\n<li aria-level=\"1\">Hard to control when multiple people edit, especially with the file share<\/li>\n<li aria-level=\"1\">No warning mechanism, late-term management only discovered the problem when already late<\/li>\n<li aria-level=\"1\">Teen synthesis report in real time, causing difficulties in the quick assessment of the overall situation<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">According to McKinsey, the lack of tools to monitor progress and to collaborate effectively can reduce the labor productivity of the business from 20-30%.<\/p>\n<h2 style=\"text-align: justify;\">5. When business should be moved from the file track progress to management software work?<\/h2>\n<p style=\"text-align: justify;\">In the early stages, file, track progress work (usually Excel) is the right tool to business form the habit management work plan. However, when the scale and level of complexity of the work increases, the continuation depends entirely on the Excel file can become barriers instead of solutions.<\/p>\n<p style=\"text-align: justify;\">The important question is not \u201cshould we use Excel or not,\u201d which is when Excel no longer meet the needs of management. Indication Excel file that no longer fit<\/p>\n<h3 style=\"text-align: justify;\">The amount of work and project rising fast<\/h3>\n<p style=\"text-align: justify;\">When a business has just a few dozen early work, a table, progress tracking, simple tasks can still be in control. But when the amount of work increased hundreds of stretches in many projects, Excel begins to reveal limitations: file increasingly heavy, difficult to filter, difficult to follow the relationship between the work.<\/p>\n<p style=\"text-align: justify;\">At this point the management no longer \u201clook file is immediately understood the situation,\u201d which takes time synthetic crafts, reduces the effectiveness of decision-making.<\/p>\n<h3 style=\"text-align: justify;\">Many departments work together to perform work<\/h3>\n<p style=\"text-align: justify;\">When the work involves many departments, the use of a common excel file to manage the progress of the work will arise the problem:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Who is the last update?<\/li>\n<li aria-level=\"1\">Information may be overwritten or lack of consistency not?<\/li>\n<li aria-level=\"1\">Departments which are \u201cpoints of congestion\u201d in the chain work?<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Excel was not designed to handle the work flow related departments. The lack of decentralization and update history clear that the responsibility prone to faint.<\/p>\n<h3 style=\"text-align: justify;\">Management need to report in real time<\/h3>\n<p style=\"text-align: justify;\">At the stage of business growth, leaders often need to know:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Right at this time, tasks are late?<\/li>\n<li aria-level=\"1\">On any project at risk of not achieving planned?<\/li>\n<li aria-level=\"1\">Resources are being herded into now?<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">File tracking work progress update can not meet the reporting needs in real time. Information often have latency, causing decisions to be taken when problems have occurred.<\/p>\n<h2 style=\"text-align: justify;\">6. Businesses should start from where to manage the progress of work efficiency?<\/h2>\n<p style=\"text-align: justify;\">Progress management efficiency does not start from the tool, which start from the right approach.<\/p>\n<h3 style=\"text-align: justify;\">Start with the file tracking work progress properly<\/h3>\n<p style=\"text-align: justify;\">With many businesses, the Excel file is still the starting point reasonable if used properly.<\/p>\n<p style=\"text-align: justify;\">Standardized form: Business should have a template excel track the progress of the work shared, instead of each of the departments diy a fashion. The standardized data synthesis and comparison.<\/p>\n<p style=\"text-align: justify;\">Specify how to update: Need to specify:<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Ai updates<\/li>\n<li aria-level=\"1\">Updates when (by day, week by week)<\/li>\n<li aria-level=\"1\">Updates what information<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">This helps the board monitor the progress of the work always reflects reality, avoid the status of \u201cfile there, but nobody uses\u201d.<\/p>\n<p style=\"text-align: justify;\">Mounting specific responsibilities: Every work in the excel file to manage the progress of work should have the main responsibility. When the clear responsibility, the progress will be significantly improved.<\/p>\n<h3 style=\"text-align: justify;\">Combined file tracking tool management overall<\/h3>\n<p style=\"text-align: justify;\">At the stage of development is higher, the business should see the file tracking work progress as a part of the painting overall administration.<\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\">Connect the work progress with the process to know the work are in step<\/li>\n<li aria-level=\"1\">Mounting progress with the project to control the big goal<\/li>\n<li aria-level=\"1\">Associated with KPI to assess the actual performance<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Suitable approach is the conversion step by step, starting from Excel, then expanded into the management tool, the system administrator when the business is ready about people, processes, and budget. <span style=\"font-weight: 400;\">Watch now the solution process management the progress of the work <a href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/?utm_source=anchortext&amp;utm_medium=bang-theo-doi-tien-do-cong-viec\">LV-DX Dynamic Workflow<\/a> from Lac Viet<\/span><\/p>\n<p style=\"text-align: justify;\">\t\t<div data-elementor-type=\"loop-item\" data-elementor-id=\"33127\" class=\"elementor elementor-33127 e-loop-item e-loop-item-36455 post-36455 post type-post status-publish format-standard has-post-thumbnail hentry category-quan-tri-cong-viec-du-an tag-hieu-qua-cong-viec\" data-elementor-post-type=\"elementor_library\" data-custom-edit-handle=\"1\">\n\t\t\t<div class=\"elementor-element elementor-element-18b928f e-con-full e-flex e-con e-parent\" data-id=\"18b928f\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5586bd7 elementor-widget elementor-widget-text-editor\" data-id=\"5586bd7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p style=\"text-align: center;\"><b>LV-DX Dynamic Workflow do to simplify the conversion process of?<\/b><\/p><h3>Provides system management \u2013 standardized process of comprehensive<\/h3><ul><li>Free build standardized processes for each business, based on the requirements given and the structure departments, by operation of business when BUYING a software package process of Vietnam.<\/li><li>The system allows the storage of the entire workflow on a single platform, data is synchronized, unified, easy synthesis and analysis.<\/li><li>Provide inventory process standard reference model for construction business.<\/li><\/ul><div><dl id=\"attachment_33051\"><dt><figure style=\"width: 800px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-thu-vien-quy-trinh.png\" alt=\"Giao di\u1ec7n qu\u1ea3n l\u00fd quy tr\u00ecnh LV-DX Dynamic Workflow\" width=\"800\" height=\"500\" \/><figcaption class=\"wp-caption-text\">Provides system management \u2013 standardized process of comprehensive<\/figcaption><\/figure><\/dt><\/dl><\/div><h3>Every activity, work performance managed, tracked live realtime (real time) on the process<\/h3><ul><li>LV-DX Dynamic Workflow integrated management software, job LV-DX Task to help work directly on the process.<\/li><li>Automatic transfer of tasks to employees, the next division at the end of the 1 stage in the process.<\/li><li>Track progress of implementation of the process, the work performance of each employee in real time.<\/li><li>Warning system work smart, auto send notification to employees involved when a process is established, the transfer task alerts, overdue done, ...<\/li><\/ul><div><dl id=\"attachment_33050\"><dt><figure style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-theo-doi-tien-do.png\" alt=\"Giao di\u1ec7n theo d\u00f5i ti\u1ebfn \u0111\u1ed9 LV-DX Dynamic Workflow\" width=\"800\" height=\"500\" \/><figcaption class=\"wp-caption-text\">Every activity, work performance managed, tracked live realtime (real time) on the process<\/figcaption><\/figure><\/dt><\/dl><\/div><h3>Application AI to help optimize performance operating procedures business<\/h3><ul><li>Integrated LV-DX eSign help job approval, signing a number of fast everything, everywhere on the process of. Leadership does not need to come to the company to make up for document browsing, now all operations can be performed remotely at all times with LV-DX Dynamic Workflow.<\/li><li>Integrated chatbot AI Lac Viet to help the leader out of control, the accurate data on the file browser to help the number quickly, avoid reporting anything complicated, optimal time is work, leaders have more time to build your business strategy, long-term performance improvements for the organization.<\/li><\/ul><div><dl id=\"attachment_33052\"><dt><figure style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-tich-hop-chatbo-ai.png\" alt=\"Giao di\u1ec7n qu\u1ea3n l\u00fd quy tr\u00ecnh LV-DX Dynamic Workflow\" width=\"800\" height=\"500\" \/><figcaption class=\"wp-caption-text\">Application AI to help optimize performance operating procedures business<\/figcaption><\/figure><p style=\"text-align: center;\"><a href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/?utm_source=blog&amp;utm_medium=banner-usp\" target=\"_blank\" rel=\"nofollow noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-32899 size-full\" src=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-van-hanh.png\" alt=\"LV-DX Dynamic Workflow v\u1eadn h\u00e0nh\" width=\"1200\" height=\"630\" srcset=\"https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-van-hanh.png 1200w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-van-hanh-768x403.png 768w, https:\/\/lacviet.vn\/wp-content\/uploads\/2024\/07\/lv-dx-dynamic-workflow-van-hanh-18x9.png 18w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/p><\/dt><\/dl><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-31dae5b elementor-widget elementor-widget-html\" data-id=\"31dae5b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"wrapper\">\n  <div class=\"box-gradient\"><strong><span style=\"color: #ffffff;\"><a style=\"color: #ffffff;\" href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/?utm_source=blog&amp;utm_medium=xem-tinh-nang\">SEE DETAILED FEATURES LV-DX DYNAMIC WORKFLOW<\/a><\/span><\/strong><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<\/p>\n<blockquote><p>Contact us Vietnam to sign up <a href=\"https:\/\/lacviet.vn\/en\/lv-dx-dynamic-workflow\/?utm_source=anchortext-demo&amp;utm_medium=bang-theo-doi-tien-do-cong-viec\"><strong>free demo<\/strong> software Workflow<\/a> to <strong>reviews the work efficiency<\/strong> operation of the business only on a system, affecting only.<\/p><\/blockquote>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Hope the information revolves around the construction of <\/span><b>panel track the progress of the work<\/b><span style=\"font-weight: 400;\"> useful to the management, leadership effectively applied for team \u2013 business.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong>CONTACT INFORMATION:<\/strong><\/p>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\">Lac Viet Computing Corporation<\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\">Hotline: 0901 555 063 | (+84.28) 3842 3333<\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\">Email: info@lacviet.vn \u2013 Website: <a href=\"https:\/\/lacviet.vn\/en\/\">https:\/\/lacviet.vn<\/a><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\">Headquarters: 23 Nguyen Thi Huynh, P. Phu Nhuan, Ho Chi Minh City<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>B\u1ea3ng theo d\u00f5i ti\u1ebfn \u0111\u1ed9 c\u00f4ng vi\u1ec7c l\u00e0 c\u00f4ng c\u1ee5 qu\u1ea3n tr\u1ecb gi\u00fap gi\u00e1m s\u00e1t nhi\u1ec7m v\u1ee5 v\u00e0 d\u1ef1 \u00e1n th\u00f4ng qua c\u00e1c th\u00f4ng tin c\u1ed1t l\u00f5i nh\u01b0 t\u00ean c\u00f4ng vi\u1ec7c, ng\u01b0\u1eddi ph\u1ee5 tr\u00e1ch, deadline, tr\u1ea1ng th\u00e1i ho\u00e0n th\u00e0nh. C\u00f4ng c\u1ee5 n\u00e0y cung c\u1ea5p c\u00e1i nh\u00ecn t\u1ed5ng qu\u00e1t \u0111\u1ec3 nh\u00e0 qu\u1ea3n l\u00fd k\u1ecbp th\u1eddi nh\u1eadn [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":36487,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[83],"class_list":["post-36455","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-quan-tri-cong-viec-du-an","tag-hieu-qua-cong-viec"],"_links":{"self":[{"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/posts\/36455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/comments?post=36455"}],"version-history":[{"count":12,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/posts\/36455\/revisions"}],"predecessor-version":[{"id":50715,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/posts\/36455\/revisions\/50715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/media\/36487"}],"wp:attachment":[{"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/media?parent=36455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/categories?post=36455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lacviet.vn\/en\/wp-json\/wp\/v2\/tags?post=36455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}